Building a new home in Brussels? It must be near zero energy, with no gas boiler
For permits applied for from April 2024, a new Brussels home may use at most 45 kWh of primary energy and need at most 15 kWh for heating per m² a year. Gas and oil boilers are banned for permits from 2025.
Brussels · Subject to change
Sources checked on · next check by . Check the source before you act.
In Brussels, the PEB rules for works set the level a new home must reach. They depend on the date you file the planning permit application. For applications from 1 April 2024, a new home may use at most 45 kWh of primary energy per m² a year, and its net heating need may be at most 15 kWh per m² a year. In some cases these limits are relaxed.
The home must also limit overheating in summer and meet minimum ventilation rates. Walls, roofs and floors may have a U-value of at most 0.24 W/m²K, windows at most 1.5, glass at most 1.1 and doors at most 2.0. A solar water heater needs its own meter.
For permit applications from 1 January 2025, gas and oil boilers may not be installed in a new home. In a project with several homes, this applies when all of them are new or treated as new.
More is coming. For permits filed from 1 January 2030 at the earliest, new homes will have to reach a zero-emission level, which still needs an implementing decree. From the same date, new homes will need solar panels or a solar water heater.
Don't count on a RENOLUTION premium for a new home: the premiums only apply to buildings older than 10 years, and they are suspended for now.
Details
| Impact | Indirect · This saves no energy by itself: it is a rule, a service, a contract, or a health or safety item. How we rate impact |
|---|---|
| Estimated saving | Not quantified; the rules set the minimum energy performance of the new home. (confidence: low) |
| Who acts | You (owner) |
| Needs landlord's agreement | No |
| Type | Rules explained |
Do this together with
Sources
- Objectifs PEB pour chaque logement et exigences PEB en cas de travaux (in French) · Bruxelles Environnement (official source) · checked on
- Exigences Umax/Rmin – Umax à partir de 2021 (Vade-mecum Travaux PEB) (in French) · Bruxelles Environnement (Guide Bâtiment Durable) (official source) · checked on
- Objectifs PEB pour chaque bien et exigences PEB en cas de travaux (in French) · Bruxelles Environnement (official source) · checked on
- Les Primes RENOLUTION (in French) · Bruxelles Environnement (official source) · checked on